Office Relocation in Mumbai
Move your office without losing a working day. We plan, pack and set up workstations, IT equipment and files over a weekend or overnight, so your team walks into a ready office.

Get a free shifting quote
Fill in the details below. Our team will call you back with a price.
Less downtime, fewer surprises
For a business, the real cost of a move is the days your team can't work. Our office relocations are planned so the gap between closing the old office and opening the new one is as short as possible.
Moving an office in Mumbai has its own rules. Commercial towers in Andheri, Powai, BKC and Lower Parel often allow goods to move only after hours. Freight lifts need booking, and every carton leaving the building may need a gate pass. We plan all of this with you and your building management before the first desk is packed.
On the day, our crew works from a labelled floor plan. Every desk, chair, monitor and file box has a code that matches its place in the new office, so things go where they belong the first time.

From the reception desk to the server rack
Every part of an office needs a slightly different approach. This is how we handle each one.
Workstations and desks
Modular desks are dismantled, fittings are bagged and labelled, and everything is rebuilt to your new layout.
Computers and peripherals
Monitors and CPUs are wrapped individually, cables are labelled and bagged, and each set is coded to its new desk.
Servers and racks
We move racks and network equipment after your IT team or vendor shuts them down, and we follow their reconnection plan.
Files and documents
Files go into numbered, sealed cartons in shelf order, so your records come out exactly as they went in.
Conference room and pantry
Conference tables, chairs, pantry appliances and crockery are packed like a home kitchen: carefully and upright.
Reception and décor
Reception counters, signage, artwork and plants are wrapped and moved so the new office looks right on day one.
Four steps to a working new office
A clear plan agreed in advance, so everyone on your team knows what happens and when.
Site visit
We visit both offices, check lift and loading access, and understand your working hours and deadlines.
Move plan
We agree a floor plan, a labelling code for every desk, and a phased or weekend schedule.
Pack & move
We pack after hours or over a weekend, department by department, and move with gate passes ready.
Set up & hand over
Desks are placed to the floor plan, IT is ready for your team to reconnect, and waste is cleared.

Your office move checklist
- Building permissionsGet moving permission from both buildings and ask about after-hours rules.
- Freight lift and loading bayBook them for the move window at both buildings.
- New floor planShare it with us so we can code every desk to its new spot.
- Data backupAsk your IT team to back up systems before shutdown.
- One contact per teamName a person in each department to answer packing questions.
- Update your addressUpdate your website, GST records, letterheads and Google Business Profile.
Offices of every size and type
From a five-desk startup in a co-working space to a full floor in a commercial tower, the planning is the same: a site visit, a written plan, labelled desks and a move timed around your working days. Only the size of the crew and the number of trips change.
- IT and software offices
- CA and law firms
- Clinics and diagnostic labs
- Co-working spaces
- Showrooms and retail stores
- Banks and finance offices
- Schools and coaching centres
- Godowns and back offices
Moving part of your office?
We also handle partial moves, such as one department, a new floor in the same building, or extra furniture into storage.
Moving your IT without the panic
Computers, servers and network equipment worry office managers more than anything else. Most of the risk comes from poor labelling and rushed disconnection, not from the transport itself.
We work alongside your IT team or IT vendor. They back up data and shut systems down. Then our crew labels every monitor, CPU, keyboard and cable with the desk code from your new floor plan. Cables go into labelled bags taped to their machine, so nothing gets separated from its desk.
Monitors are wrapped in bubble wrap with corner protection and packed upright. CPUs and laptops travel in padded cartons. Printers are emptied of loose trays and packed with their cables. Server racks and network cabinets move according to your vendor's instructions, and the movers don't power anything on.
At the new office, each set is placed on its coded desk, ready for your IT team to reconnect. On Monday morning your staff find their own machine at their own desk.

A typical weekend office move
This is how most small and mid-sized offices move with Leo, without losing a working day.
Friday evening
Staff pack personal desk items into labelled crates. Our crew begins with storage rooms, files and common areas.
Saturday
Workstations, IT equipment and furniture are packed and labelled, loaded with gate passes ready, and moved to the new office.
Sunday
Furniture is placed to the floor plan, desks are rebuilt, IT is set on the right desks, and the waste is cleared.
Monday morning
Your team walks in, finds their desk and machine, and gets to work. Our coordinator stays on call.
What decides the cost of an office move
Every office is different, so we price each move after a site visit. These are the main factors.
- Number of workstationsThe number of desks, chairs and computers to be dismantled, packed and moved.
- Files and recordsThe volume of documents and whether they need numbered, sealed cartons.
- Building accessFreight lift availability, loading bay distance and after-hours rules at both buildings.
- TimingNight and weekend moves need careful crew planning, and phased moves take more trips.
- DistanceMoves within Mumbai cost less than shifting to Pune or another city.
- StorageWhether any furniture or stock needs to go into storage for a while.
Moving shops, clinics and showrooms
Not every business move is an office full of desks. Shops, clinics, salons, showrooms and small factories each have their own equipment, and each needs to reopen as quickly as possible.
For retail stores and showrooms, we pack display stock in labelled cartons by shelf or section, wrap glass counters and mirrors carefully, and move signage and fixtures so the new store can be set up in the same layout. For clinics and diagnostic centres, we handle examination tables, cabinets and sensitive equipment according to the instructions you or your equipment supplier give us.
Wherever possible we schedule business moves after closing time or on your weekly holiday. Tell us the date you need to reopen, and we'll plan the move backwards from that day.

Office relocation questions
Can you move our office over a weekend?
Yes, and most offices prefer it. We usually pack on Friday evening, move on Saturday and set up on Sunday, so your team starts Monday in the new office.
How long does an office relocation take?
A small office of 10 to 20 desks can often move in one night or one day. Larger offices are moved in phases, department by department. After the site visit we give you a timeline that fits your working days.
Do you handle computers and servers?
We pack and move computers, monitors, printers and server racks safely, with every cable labelled. Your IT team or IT vendor should shut systems down and reconnect them, and we work to their schedule.
Do you need permission from the building?
Most commercial buildings need a moving permission, a freight lift booking and gate passes for goods leaving. We tell you what to ask for at both buildings, and our coordinator works with building management on the day.
Can you store furniture we don't need right away?
Yes. Extra desks, chairs, files and stock can go into storage and be delivered later. See our warehousing and storage service.
Related services
Planning an office move? Let's talk.
Book a free site visit. We'll send a move plan and written quote.




